How much land is needed?
Typically about a 75’ x 75’ area (roughly 5,000–7,500 square feet), depending on the site design and equipment.
Will I still be able to use my property?
Yes—cell tower sites use a small portion of land, so the rest of your property can usually be used as normal.
What does the tower look like?
Most are monopoles (a single vertical pole), though some are designed to blend in, like flagpoles or stealth structures.
How long does the process take?
From initial agreement to construction, it typically takes 12–24 months depending on zoning and approvals.
What kind of access is required?
A permanent access easement is needed so construction crews and technicians can reach the site for installation and occasional maintenance.